KOM-GEN00122-00 Komatsu

Komatsu WA470-7 Wheel Loader Field Assembly Instruction Monitor Setup and Adjustments (GEN00122-00)

$10.00
Instant digital access

Komatsu field assembly instruction GEN00122-00 for WA470-7 wheel loader setup, serial 10001 and up. Monitor service menu, options, boom angle, EPC detent and current, bucket positioner. 43 pages.

Subscribe for free access to every manual instead.

Specifications
BrandKomatsu
ModelWA470-7
Manual NumberGEN00122-00
ModelWA470-7
Serial10001 and up
TypeField assembly: setup and adjustments
IncludesMonitor service menu, EPC calibration
Pages43
CompatibilityKomatsu WA470-7 wheel loader, serial 10001 and up. Field Assembly Instruction GEN00122-00: machine monitor setup and post-assembly adjustments.
FormatPDF
DeliveryInstant, after checkout
Product codeKOM-GEN00122-00
Instant accessDownload link after checkout
Any deviceComputer, tablet or phone
Support[email protected]

GEN00122-00 isn't about bolting parts on. It covers the electronic setup a WA470-7 needs after field assembly or after a major repair.

Fits

WA470-7 from serial 10001. The WA380-7 has a similar guide, GEN00114-00.

Quick facts

  • Manual Number: GEN00122-00
  • Model: WA470-7
  • Serial: 10001 and up
  • Type: Field assembly: setup and adjustments
  • Includes: Monitor service menu, EPC calibration
  • Format: PDF, 43 pages

What's in it

It explains how to enter the machine monitor service menu and delete the electrical system abnormality record, so you start with a clean fault history. Then it covers selecting the options fitted to the machine.

The adjustments follow in order. First the work equipment controller boom angle, then the EPC lever detent position and EPC starting current, and finally the bucket positioner and the rear-view monitor guide line position.

If these steps are skipped, the loader will run but the boom kickout, the positioner and the lever feel won't be right, and the camera lines won't match the machine. Dealer technicians use it at handover, and it's useful after replacing a controller or a sensor.

Table of contents

  • Entering the machine monitor service menu
  • Deleting the electrical system abnormality record
  • Selecting options
  • Work equipment controller boom angle adjustment
  • EPC lever detent position and EPC starting current
  • Bucket positioner and rear-view monitor guide line position

Good to know

Work through the adjustments in the order the guide gives them, because some settings depend on the ones before. Have the machine warmed up, parked on level ground and with the work equipment able to move through its full range. Write down each value you set, so you have a record for the next service or if a controller is ever replaced.

Before you buy

Setup and adjustment only. Repairs need the WA470-7 shop manual.

PDF, 43 pages, English. Download link straight after checkout. We're an independent seller with no link to Komatsu.